Digital transformation
Digital transformation is deciding which system to build in which order. INDOLES does not propose changing everything at once; it finds the tightest bottleneck, starts there, and moves to the next step only once the previous one has paid off.
- SAP
- Shopify
This service steps in when one of these is true.
The same information is typed into three places and no one knows which is right.
Software vendors keep sending proposals and it is unclear which is actually needed.
An order or work request can get lost inside the company.
What it covers, and what it does not.
What's included
Current state map
Which work runs in which system, where data sits and where it is carried by hand — mapped through on-site observation.
Bottleneck identification
Which step causes the most lost time, errors and waiting? Determined by measurement, not assumption.
System requirements list
Which software is genuinely needed and which need can be met with existing tools. Vendor proposals get judged against this list.
ROI projection
Setup cost, time saved and payback period are calculated for each step, and the ordering follows that calculation.
Roadmap
A 12-24 month plan: which system when, on what budget. Each stage ends in a state that works on its own.
Vendor selection support
Writing specifications, comparing proposals and reviewing contracts — judged on the requirements list, not the vendor's pitch.
Running the first stage
The roadmap's first step is delivered under INDOLES oversight; later steps continue with the in-house team or a vendor.
What's not included
- Selling ERP and software licences — INDOLES is not a reseller
- Hardware, server and network equipment procurement
- Internal change management and HR consulting
- Day-to-day system administration and an end-user help desk
Four steps, each leaving something in your hands.
- 01
On-site observation
How the work actually runs is observed on site. The gap between written procedure and real practice only shows there.
You getA current-state map and a list of the manual steps.
- 02
Prioritisation
Bottlenecks are ranked by return. The step losing the most goes first — not the one with the newest technology.
You getA ranked bottleneck list with an ROI projection.
- 03
Roadmap
Which system gets built when and on what budget — a 12-24 month plan written and presented to management.
You getThe roadmap document and a stage-by-stage budget.
- 04
Building the first step
The first stage of the plan is delivered and its result measured. A transformation plan that stays on paper is worthless.
You getA working first stage with its result measured.
What you hold when the work is done.
- Current state map Document
- Systems, data flow and hand-carried work in one diagram.
- Bottleneck report Document
- The steps losing most, with measured time and error rates.
- ROI projection Document
- Cost, gain and payback period calculated for each stage.
- Roadmap Document
- A 12-24 month build plan with budget and ordering rationale.
- Vendor specification Document
- A requirements list and comparison table for collecting proposals.
- First stage build System
- The roadmap's first step, working and with results measured.
The questions asked most before deciding.
Does digital transformation mean buying an ERP?
Do you sell software?
Do we have to change everything at once?
How long does the roadmap work take?
Can this be done without stopping production?
What is digital transformation?
Does Industry 4.0 work fall inside this scope?
Where does digital transformation start at SME scale?
Who from your side is involved, and for how long?
Who builds the systems once the roadmap is ready?
When is digital transformation advisory the wrong choice?
Next
What the work produced
Meccanotecnica Umbra is the Türkiye arm of one of the world's leading mechanical seal manufacturers, yet its technical visibility in the local market lagged behind its global standing. We connected the product catalogue to an AI advisor that lays out the right equipment for an engineer describing their plant, and to a quote portal. Quote requests rose tenfold and response time dropped by ninety percent.
- Quote requests
- 10×
- After the portal and AI advisor went live
- Faster response
- 90%
- The request-to-response step runs in CRM automation
- Monthly organic impressions
- 15,000
- Still climbing; on an architecture built from scratch
Source Meccanotecnica Umbra Türkiye — 10× more quote requests, driven by an AI technical advisor.
The entry package for this service
Neighbouring services
Where do we start?
Three entry doors at three speeds. Pick the one that fits.